GTO Construction
GTO Construction Logo
Drilling Pad & Well Pad Construction

Drilling Pad & Well Pad Construction

Drill pads and well pads built to spec across the Eagle Ford Shale and Permian Basin

Drill Pad Construction Built for the Oilfield

Since 2011, GTO Construction has built drill pads and well pads for oil & gas operators across South Texas. A pad has to be level, stable, and all-weather to keep a drilling program on schedule — and that is exactly what our civil crews deliver.

We handle the full scope: clearing and grubbing, cut-and-fill earthwork, engineered compaction, caliche and road base, access roads, and final restoration. Because we self-perform the earthwork and coordinate closely with your construction managers, we mobilize fast and hit your spud date.

Drill pads are part of our broader civil & earthworks capability, which also includes frac ponds and access roads. See where we work across the Eagle Ford and Permian Basin.

Drill pad construction and earthwork in South Texas

Our Drill Pad Construction Services

Site Clearing & Prep

Clearing, grubbing, and grading to turn raw ground into a stable, level location ready for the rig.

Earthwork & Compaction

Cut-and-fill earthwork with engineered compaction so your pad holds up under heavy rig and truck loads.

Caliche & Road Base

Caliche and road base placement for an all-weather working surface that performs through the drilling program.

Access Roads

Lease and access road construction so crews and equipment reach the location safely in any conditions.

Reclamation & Restoration

Once the program is complete, we restore the location to operator and surface-owner requirements.

Built to Spec

We build to your dimensions and specifications, coordinating closely with your drilling and construction managers.

How We Build a Drilling Pad

Every location is different, but most drilling pad construction follows the same sequence from raw ground to a rig-ready surface.

  1. 1

    Scope, Layout & Schedule

    We start from your pad layout, dimensions, and access route, and work directly with your construction manager to build the schedule backward from your spud date.

  2. 2

    Clearing & Grubbing

    Brush, trees, and roots are removed from the pad and lease road footprint. Topsoil is typically stripped and stockpiled so it is available for reclamation later.

  3. 3

    Cut-and-Fill Earthwork & Compaction

    We grade the location to design elevation, placing and compacting fill in lifts so the pad carries rig, frac, and truck loads without settling.

  4. 4

    Caliche & Road Base Surfacing

    A caliche or road base cap gives the pad an all-weather working surface that holds up through the drilling and completions program.

  5. 5

    Lease Road & Drainage

    We build the lease or access road and grade drainage so water moves off the location instead of ponding on the working surface.

  6. 6

    Reclamation & Restoration

    When the program is finished, we reduce or restore the location to operator and surface-owner requirements.

What Affects Drilling Pad Construction Cost?

Operators often ask what a drilling pad costs. The honest answer is that it depends on the location. These are the main factors that drive the price of a pad:

  • Pad size and layout
  • Terrain and the volume of cut and fill
  • Soil conditions and imported material
  • Caliche or road base source and haul distance
  • Lease road length and condition
  • Drainage and erosion-control needs
  • Reclamation requirements
  • Schedule, including expedited work around a spud date

We price every part of the pad scope up front: clearing, dirt work, surfacing, roads, and reclamation. Your quote reflects the full job, not just the earthwork.

Request a Full-Scope Quote

Well Pad Site Preparation From One Contractor

A drilling pad is rarely a stand-alone job. Completions need water storage, production needs flowlines, and the location needs ongoing upkeep once it is producing. GTO Construction handles each of those as well:

Working with one contractor across the location means fewer handoffs between vendors and one point of contact for your project manager.

Drilling Pad Construction FAQ

How long does it take to build a drill pad?+

It depends on size, terrain, and required earthwork, but many pads are completed in a matter of days once mobilized. Because quick turnaround is core to how we work, we coordinate around your spud date and confirm a realistic schedule up front.

What is included in drill pad construction?+

Our scope typically covers clearing and grubbing, cut-and-fill earthwork, compaction, caliche or road base, access roads, and final restoration. We can price the full scope or any portion of it based on what your project needs.

Do you build the access roads too?+

Yes. We build lease and access roads alongside the pad so your crews and heavy equipment can reach the location safely in all weather.

What areas do you serve for drill pad construction?+

We build pads throughout the Eagle Ford Shale, the Permian Basin, and South Texas, mobilizing from our base in Three Rivers, TX.

How much does a drilling pad cost?+

There is no single price for a drilling pad. Cost depends on pad size and layout, terrain and cut-and-fill volume, soil conditions, where the caliche or road base comes from and how far it is hauled, lease road length, drainage, and reclamation requirements. Once we have your layout and location, we quote the full scope up front so the number reflects the whole job.

Is a drilling pad the same as a well pad?+

Yes. Drill pad, drilling pad, well pad, pad site, and location are used interchangeably in the oilfield. They all describe the leveled, surfaced area that supports the rig, equipment, and traffic during drilling and completions.

Can you also build the frac pond and the pipeline?+

Yes. Along with the pad, we build frac ponds, construct and hydrotest pipelines, and provide roustabout crews, so one contractor can cover the location from dirt work through tie-in.

Need a Drill Pad Built on Schedule?

Contact GTO Construction for drill pad and well pad construction across the Eagle Ford Shale and Permian Basin.

Request a Quote
Call NowGet a Quote